Projects Under Safer communities through resilient infrastructure

1 . Design and Construction of Class room building, British School, Nepal, June 2015 – Dec 2015

  • Design and construction supervision of 2 Steel structure class room buildings in Lalitpur

  1. Vulnerability & Post Damage assessment and retrofitting design of NRCS Building in Bhaktapur, DAN Church, Feb 2015 – Sept 2015

  • Physical verification & NDT test

  • Structural evaluation and seismic performance evaluation of building, Retrofitting design and cost estimation – 2 buildings

  • Construction Management

  1. Vulnerability Assessment and Retrofitting , British School, Nepal, Dec 2014 – May 2015

  • Physical verification & NDT test

  • Structural evaluation and seismic performance evaluation of building, Retrofitting design and cost estimation – 13 buildings

  • Construction Management

  1. Nepal Hospital Seismic Retrofitting Project (NHSRP), DFID, Nepal, Nov 2013 – March 2015

a. Targets:

Hospital buildings of National Academy of Science Bir Hospital

Nepal police Hospital

Kanti Children Hospital

b. Work Done

Hospital structural surveys

NDT Test and core test

Measurement survey and as built drawing, initial seismic modeling and analysis

  1. Supervision of Retrofitting of Bungmati Health Post building and 2 school building in Lalitpur, World Vision, Aug 2013 – Nov 2013

  • Construction supervision and quality control

  1. Nepal Hospital Seismic Retrofitting Project (NHSRP), Ramboll UK Ltd., June 2014 – Nov 2014

  1. Target (in Far western Region)

  • Bajhang District Hospital

  • Seti Zonal Hospital

  • Mahakali Zonal Hospital

  1. Work Done

  • Hospital structural surveys

  • NDT Test and core test

  • Measurement survey and as built drawing

  • Initial seismic modeling and analysis of Hospital buildings

  1. Seismic Vulnerability Assessment for buildings and warehouses, International Federation of Red Cross and Red Crescent Societies (IFRC), Jun 2014 – Nov 2014

  • Mapping of NRCS facilities in six districts; Kathmandu, Lalitpur, Bhaktapur, Nuwakot, Kavre and Sindhupalchowk

  • Survey and NDT test

  • Structural analysis, retrofitting design & cost estimate – 17 Buildings

  • Development of preliminary Vulnerability assessment tool and training to NRCS staff

  1. Increasing the Resilience of the Kathmandu Valleys Health System, Save the Children, April 2014 – Dec 2014

  • Vulnerability assessment of Health facilities – Non structural

  • Retrofitting design of non structural component and cost estimates.

  • Develop guideline on retrofitting of non structural component of health facilities

  • Training and workshops

  • Retrofitting work and construction

  1. Set up and Operationalization of Health Emergency Operation Center (HEOC) at MOHP, World Health Organization (WHO), March 2014 – Aug 2014

  • Technical support on set up and Operationalization of HEOC

  1. Structural Evaluation of RAP-3 office building, Rural Access Program 3 (RAP-3), Jan 2014 – Feb 2014

  • Physical verification on drawing and design

  • NDT test

  • Structural Analysis and Retrofitting design & cost estimate

  1. Lalitpur Earthquake Preparedness Project (LEPP), World Vision, Jan 2014 – May 2014

  • Situation analysis of schools/ Health post

  • Prepared the design & cost estimate for retrofitting of 5 buildings

  • Onsite training to mason

  1. Reconstruction and Retrofitting of School Building program– Eastern earthquake 2011, Save the Children, Jan 2014 – Feb 2014

  • Assessment of implementation status

  • Assessment of structural strength of school building retrofitted – 5 Nos.

  • Develop model for replication

  1. Retrofitting of WB office Building, World Bank, Nepal, May 2013 – August 2013

  • Independent Review and check of retrofitting works and quality control

  1. Vulnerability Assessment, Retrofitting design and retrofitting of office buildings of HI, Handicap International (HI), May 2013 – Sept 2013

  • Physical verification on drawing and design

  • NDT test

  • Structural Analysis and Retrofitting design

  • Construction Management

  1. Vulnerability Assessment of buildings lease by Expatriate staffs, Save the Children, Nepal, Feb 2013 – Dec 2013

  • Structural analysis of buildings and prepare status report on structural condition

  1. Lalitpur Earthquake Preparedness Project, WORLD Vision, Feb 2013 – March 2013

  • Rapid Assessment of schools and health posts of Lalitpur district and preparation of assessment report

  • Structural analysis and retrofitting design of 3 buildings

  1. Vulnerability Assessment of buildings lease by Expatriate staffs, Handicap International, Nov 2012 – May 2013

  • Structural analysis of buildings and preparation of status report on structural condition

  1. Vulnerability Assessment and Retrofitting Design of Hospital Buildings, B. P. Memorial Hospital, Kathmandu, Oct 2012 Dec 2012

  • Physical verification on drawing and design

  • NDT test

  • Structural Analysis and Retrofitting design

  1. Damage Assessment and Retrofitting measures, Hotel de l’ Annapurna, Dec 2011- Jan 2012

  • Damage assessment

  • NDT test

  • Structural Analysis

  • Retrofitting design

  1. Vulnerability Assessment and Retrofitting Design of Hospital Buildings, Mahendra Narayan Nidhi Hospital, Kathmandu, Nov 2011 – Dec 2012

  • Physical verification on drawing and design

  • NDT test

  • Structural Analysis and Retrofitting design

  1. Vulnerability Assessment of Building of Expatriate staff, Save the Children, July 2011 – Aug 2011

  • Structural analysis of buildings

  • Prepare status report on structural condition